Drillers Report Multiple Wells In East Texas Counties
DEVELOPMENTAL
Freestone County
Devon Energy Production Co. LP will drill the C.E. Neal GU B-1 Well No. 15H in the Nan-Su-Gail (Cotton Valley Consolidated) Field. It will be located 5.1 miles northeast of Fairfield in the Riondo, M Survey, A-25 with a depth of 13,000 feet.
Harrison County
The Blocker (Cotton Valley) Field will see the J. Phillip Thompson Gas Unit Well No. 8H drilled by BP America Production Co. It will bottom at 13,500 feet in the Martin, G Survey, A-447.
Houston County
In a lease 19.4 miles southwest of Crockett, in the Fort Trinidad, East (Buda) Field, the Shelly Well No. 2 will be drilled by TXCO Resources Inc. It will bottom at 11,200 feet in the Clark, B Survey, A-23.
Leon County
In a lease 4.3 miles southwest of Wealthy in the Hilltop Resort (Bossier) Field, the Little 4 Ranch Well No. 1 will be drilled by EnCana Oil & Gas (USA) Inc. to 19,500 feet in the Viesca, J M Survey, A-30.
Limestone County
The Gilliam “C” No. 2 Gas Unit Well No. 24 will be drilled 8.1 miles southwest of Teague in the Freestone (Cotton Valley-Bossier Consolidated) Field. It will bottom at 13,400 feet in the Chavert, J L Survey, A-4.
Nacogdoches County
Samson Lone Star LLC will drill the Barrett-Charles GU 1 Well No. 1, the Garrett GU 1 Well No. 2 and the Franki Marie GU 1 Well No. 4. The No. 1 well will be located three miles south of Cushing in the Trawick (Pettit) Field with a depth of 11,000 feet. It will lie in the Oliver, A Survey, A-43 and may also be drilled in the Trawick (James) Field, the Trawick (Travis Peak) Field or a wildcat field. The No. 2 well will be located six miles southeast of Cushing in the Douglass, West (Travis Peak) Field with a depth of 12,000 feet. It will lie in the Brewer, H Survey, A-11 and may also be drilled in a wildcat field, the Nacogdoches, East (James Lime) Field, the Miyagi (Pettit) Field or the Little Ears (Pettit Lime) Field. The No. 4 well will be located 10.5 miles northwest of Nacogdoches in the Douglass, West (Travis Peak) Field with a depth of 12,000 feet. It will lie in the Ashley, W Survey, A-67 and may also be drilled in the Little Ears (Pettit Lime) Field, the Nacogdoches, East (James Lime) Field, a wildcat field or the Miyagi (Pettit) Field.
Navarro County
Activa Resources LLC will drill the Cerf Well No. 6 in the Corsicana (Shallow) Field. Location will be 6.5 miles southeast of Corsicana in the James Smith Survey, A-726. Total depth will be 3,000 feet.
Activa Resources LLC will drill the Cerf Well No. 6 in the Corsicana (Shallow) Field. Location will be 6.5 miles southeast of Corsicana in the James Smith Survey, A-726. Total depth will be 3,000 feet.
Panola County
Anadarko E&P Co. LP will drill the CGU 8 Well No. 13 in the Carthage (Cotton Valley) Field. The well will bottom at 11,000 feet in the Longacre, U J Survey, A-403 3.9 miles southwest of Carthage.
Robertson County
EnCana Oil & Gas (USA) Inc. will drill 10 new wells.
The Hanhart Well No. 1 will be located 6.3 miles northeast of Franklin in the Bald Prairie (Cotton Valley Consolidated) Field. It This well will lie Pereira, P/Grande, J&M Survey, A-32, with a depth of 16,000 feet. The Hill, Bonnie Et Al Well No. 1 will be located 0.7 miles northeast of Owensville in the Bald Prairie (Cotton Valley Consolidated) Field. It will lie in the Love, D H Survey, A-212, with a depth of 17,000 feet. The S. McLean G Well No. 2 will be located 9.6 miles northeast of Franklin in the John Amoruso (Bossier) Field. It will lie in the Viesca, J M Survey, A-46, with a depth of 19,000 feet.
The Reeves Gas Unit Well No. 2 will be located 0.6 miles northwest of Franklin in the Bald Prairie (Cotton Valley Consolidated) Field. It will lie in the Slauter, F Survey, A-335 with a depth of 16,000 feet. The Dodds, R. L. Jr. Well No. 2 will be located 7.9 miles northeast of Franklin in a wildcat field. It will lie in the Pereira, P/Grande, J & M Survey, A-32, with a depth of 18,000 feet and may also be drilled in the John Amoruso (Bossier) Field. The Dodds, R.L. Jr. B Well No. 3 will be located seven miles northeast of Franklin in the John Amoruso (Bossier) Field. It will lie in the Pereira, P/Grande, J & M Survey, A-32, with a depth of 20,000 feet.
The Sybil Marshall Unit Well No. 3 will be drilled 4.3 miles northeast of Franklin in the Bald Prairie (Cotton Valley Consolidated) Field. It will lie in the Gray, W F Survey, A-157, with a depth of 15,000 feet. The McLean-Martin Well No. 4 will be located 11 miles northeast of Franklin in the John Amoruso (Bossier) Field. It will lie in the Pereira, P/Grande, J & M Survey, A-32, with a depth of 19,000 feet. The Laxson Well No. 5 will be drilled 9.1 miles northeast of Franklin in the John Amoruso (Bossier) Field. It will lie in the Pereira, P/Grande, J & M Survey, A-32, with a depth of 20,000 feet. The Law Unit Well No. 11 will be located five miles northeast of Franklin in the Bald Prairie (Cotton Valley Consolidated) Field. It will lie in the Goodloe, R K Survey, A-156 with a depth of 16,000 feet.
Rusk County
The Nana Gas Unit No. 1 Well No. 7 will be drilled by Sandridge Onshore LLC in the Minden (Cotton Valley Consolidated) Field. Location will be 5.4 miles southeast of Henderson in the White, J M Survey, A-813, to a depth of 12,000 feet. It may also be drilled in the Minden (Travis Peak Consolidated) Field or a wildcat field.
San Augustine County
The Angie (James Lime) Field will see the Timberstar-Waterman Well No. 1H drilled by Southwestern Energy Production Co. It will bottom at 7,600 feet, six miles north of Attoyac in the HT&B RR Co./Waterman, W M Survey, A-620. It may also be drilled in a wildcat field.
The Angie (James Lime) Field will see the Timberstar-Waterman Well No. 1H drilled by Southwestern Energy Production Co. It will bottom at 7,600 feet, six miles north of Attoyac in the HT&B RR Co./Waterman, W M Survey, A-620. It may also be drilled in a wildcat field.
Shelby County
The Bradshaw Well No. 1 will be located 9.5 miles southwest of Center in a wildcat field. Newfield Exploration Co. will drill the well to 12,500 feet in the Bradshaw, G W Survey, A-93. It may also be drilled in the Angie (Travis Peak, Transitional) Field, the Angie (Rodessa) Field or the Angie (Travis Peak) Field.
Upshur County
In a lease 9.5 miles northeast of Gilmer in a wildcat field, the Hargest Gas Unit Well No. 1 will be drilled by Apache Corp. Total depth will be 16,000 feet in the Robertson, C Survey, A-426. It may also be drilled in the Sand Hill (Cotton Valley Sand) Field or the Sand Hill (Cotton Valley Lime) Field.
In a lease 9.5 miles northeast of Gilmer in a wildcat field, the Hargest Gas Unit Well No. 1 will be drilled by Apache Corp. Total depth will be 16,000 feet in the Robertson, C Survey, A-426. It may also be drilled in the Sand Hill (Cotton Valley Sand) Field or the Sand Hill (Cotton Valley Lime) Field.
Angelina County
The Preston Heirs Unit Well No. 6 will be located 3.3 miles northeast of Wells in the Raintree (Hosston) Field. It will be drilled by EnCana Oil & Gas (USA) Inc. to 14,000 feet in the Durst, J Survey, A-703.
The Preston Heirs Unit Well No. 6 will be located 3.3 miles northeast of Wells in the Raintree (Hosston) Field. It will be drilled by EnCana Oil & Gas (USA) Inc. to 14,000 feet in the Durst, J Survey, A-703.
COMPLETIONS
Cass County
The Nichols Well No. 1 was completed by Stetson Petroleum Corp. in the Rodessa Field. Location is 1.4 miles southeast of McLeod with a depth of 7,041 feet. It flowed with 20.04 barrels of crude per day, no choke size was recorded. Production is in the Pettit Lime formation.
The Nichols Well No. 1 was completed by Stetson Petroleum Corp. in the Rodessa Field. Location is 1.4 miles southeast of McLeod with a depth of 7,041 feet. It flowed with 20.04 barrels of crude per day, no choke size was recorded. Production is in the Pettit Lime formation.
Cherokee County
The Chronister Heirs Well No. 14 is located 4.80 miles northwest of Wells in the Doyle Creek Field. It was bottomed at 12,300 feet by XTO Energy Inc. It potentialed 1.968 million cubic feet of gas per day on a 16/64-inch choke. Production is in the Travis Peak formation.
The Chronister Heirs Well No. 14 is located 4.80 miles northwest of Wells in the Doyle Creek Field. It was bottomed at 12,300 feet by XTO Energy Inc. It potentialed 1.968 million cubic feet of gas per day on a 16/64-inch choke. Production is in the Travis Peak formation.
Freestone County
The Craig Gas Unit Well No. 1 was completed 6.40 miles southeast of Teague in the Freestone Field by XTO Energy Inc. It was bottomed at 12,373 feet and potentialed 491,000 cubic feet of gas per day on a 14/64-inch choke. Production is in the Cotton Valley-Bossier Consolidated formation.
Harrison County
Valence Operating Co. has completed the Barker-Botter Well No. 1 in the Oak Hill Field commingled with the Carthage, North Field. Location is 4.3 miles northeast of Easton with a depth of 12,310 feet. On a 48/64-inch choke, it potentialed 1.678 million cubic feet of natural gasper day. Production is in the Bossier Shale formation and the Cotton Valley.
Henderson County
The Lee Heirs Well No. 1 is located five miles north of Athens in the Thomas Lake Field. Decker Operating Co. LLC completed the well to 12,094 feet. It potentialed 695,000 cubic feet of gas per day on a 20/64-inch choke. Production is in the Cotton Valley formation.
The Lee Heirs Well No. 1 is located five miles north of Athens in the Thomas Lake Field. Decker Operating Co. LLC completed the well to 12,094 feet. It potentialed 695,000 cubic feet of gas per day on a 20/64-inch choke. Production is in the Cotton Valley formation.
Leon County
In a lease 6.60 miles northwest of Jewett in the Bear Grass Field, the Gail King Well No. 25H was completed by XTO Energy Inc. The well was bottomed at 17,136 feet and potentialed 21.600 million cubic feet of gas per day on a 48/64-inch choke. Production is in the Cotton Valley Consolidated formation.
Limestone County
The Alton Sims Well No. 5 U is located 11.5 miles northwest of Jewett in the Navasota Field. O’Benco, Inc. completed the well to 11,800 feet. On a 24/64-inch choke, it potentialed 2.916 million cubic feet of gas per day. Production is in the Pettit formation.
Nacogdoches County
When gauged on a 20/64-inch choke, the Blount “A-1” Gas Unit Well No. 11 potentialed 2.132 million cubic feet of gas per day. EOG Resources Inc. completed the well to 10,033 feet. Location is 5.2 miles northwest of Garrison in the Appleby, North Field. Production is in the Travis Peak formation.
Navarro County
The Sloan “D” Well No. 2 is located three miles northwest of Powell in the Big “R” Field. It was completed to 9,500 feet by O’Ryan Oil and Gas. It flowed with 475 barrels of crude per day, choke size not available. Production is in the Smackover formation.
The Sloan “D” Well No. 2 is located three miles northwest of Powell in the Big “R” Field. It was completed to 9,500 feet by O’Ryan Oil and Gas. It flowed with 475 barrels of crude per day, choke size not available. Production is in the Smackover formation.
Panola County
In a lease 0.8 miles southwest of Long Branch, in the Brachfield, Southeast Field, the Phillips Gas Unit Well No. 1 was completed by Enduring Resources LLC. It was bottomed at 10,315 feet and potentialed 570,000 cubic feet of gas per day on an adjustable choke. Production is in the Cotton Valley formation.
Robertson County
In a lease 18.4 miles northeast of Franklin in the Bald Prairie Field, the Bumpurs Gas Unit Well No. 1 was completed by XTO Energy Inc. It was bottomed at 14,841 feet and potentialed 918,000 cubic feet of gas per day on a 14/64-inch choke. Production is in the Cotton Valley Consolidated formation.
Rusk County
The Freeman Miller G.U. 2 Well No. 2 was completed five miles north of Henderson in the Minden Field. EOG Resources Inc. completed the well to 10,880 feet. On a 30/64-inch choke, it potentialed 120,000 cubic feet of natural gas per day. Production is in the Travis Peak Consolidated formation.
Shelby County
The Hunt Well No. 4 is located one mile east of Joaquin in the Joaquin Field. Hunt Petroleum Corp. completed it to 10,007 feet. On an 18/64-inch choke, it potentialed 436,000 cubic feet per day. Production is in the Travis Peak formation.
Upshur County
When gauged on an 18/64-inch choke, the Wilson Well No. 1 potentialed 208,000 cubic feet of gas per day. It was completed by Matador Production Co. in the Rosewood Field to a depth of 11,360 feet. Location is 7.6 miles northwest of Gilmer. Production is in the Cotton Valley formation.
When gauged on an 18/64-inch choke, the Wilson Well No. 1 potentialed 208,000 cubic feet of gas per day. It was completed by Matador Production Co. in the Rosewood Field to a depth of 11,360 feet. Location is 7.6 miles northwest of Gilmer. Production is in the Cotton Valley formation.
Van Zandt County
The Chandler Well No. 3 potentialed 1.686 million cubic feet of gas per day on a 12/64-inch choke. It was completed to 8,275 feet in a wildcat field. Parten Operating Inc. completed the well two miles west of Ben Wheeler.
The Chandler Well No. 3 potentialed 1.686 million cubic feet of gas per day on a 12/64-inch choke. It was completed to 8,275 feet in a wildcat field. Parten Operating Inc. completed the well two miles west of Ben Wheeler.
The East Texas Drilling Report is compiled of Texas Railroad Commission records and written by Joyce Dukes Report Service in Kilgore.